Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Ryrie Street Michelago - 066466-16NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Dec 2016 - Jun 2017
Australian Government Contribution:$385,939

Project Description

The existing road formation is inconsistent and narrow in several locations including past the school frontage. The increased traffic using the narrow seal is resulting in increased damage to the edge of the seal and shoulder pavement. The increased traffic has also raised safety issues with traffic, school busses, pedestrians, and heavy vehicles operating together on the narrow pavement.

Application of a correctional course to the existing road pavement and stabilise the pavement to 2.5% to 250mm with 60/40 Slag/lime. Widen formation to permit 2 * 3.5m trafficable lanes with a minimum 0.3m sealed shoulders each and a 2.2m shared cycle lane. Constuct a 2.2m shared cycle lane on the southern side. Seal constructed and rehabilitated surfaces with a 10mm Primer Seal, reinstate linemarking and signage.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/08/2017