Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Marsden Street - 066467-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2016 - Dec 2016
Australian Government Contribution:$183,507
State:NSW

Project Description

The existing road surface is old and affected by numerous cracks, pavement deformations and failures. Also kerb and gutters are tilted reducing their capacity to collect water and convey it to the stormwater drainage system

The proposed works includes repair of tilted sections of kerb and gutters, repair of damaged pavement areas and resurfacing of the road with hot mix asphalt. Length = 276 m; Width = 8.2 m; Area = 2263 m2.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 17/05/2017