Project Description

The existing pavement is affected by large number of cracks and pavement failures. It is old, brittle and prone to development of potholes.

The proposed work includes repair of pavement failures and resurfacing of the road with hot mix asphalt. Length = 550 m; Width = 8.2 m; Area = 4510 m2.

Total cost of proposed project is $139,996

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.