Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Gray Street, Corowa - 066605-16NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Mar 2017
Australian Government Contribution:$172,998

Project Description

Road surface is deformed, rough, irregular in shape and of poor presentation. The current surface levels do not cater for adequate drainage.

Install new kerb and gutter. Extension of the piped drainage system as required. Rip and rework existing road pavement. Suitable material retrieved from the reworking the road will be used to for the sub-base of the shoulder pavement. Lay 100mm DGB20 roadbase material over full width of the road formation. Spray 7mm primer seal. Line marking and erection of roadside furniture.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/09/2017