Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Altair St, South Tweed Heads - 066880-16NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Nov 2016 - Dec 2016
Australian Government Contribution:$160,301
Local Council/Shire:Tweed Shire Council

Project Description

The existing sealed road is in poor condition with numerous surface defects, pavement failures and extensive cracking. The cracking is allowing moisture to penetrate the pavement causing accelerated deterioration and poor ride quality to road users. Repair of the frequent and repetitive pavement and surface failures causes high maintenance expenditure.

Rehabilitation through the excavation and removal of existing pavement, placement of new pavement and application of a new sealed asphalt surface.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 17/05/2017