Woodleigh-Byro Road. Shark Bay Western Australia - 067006-16WA-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:May 2017 - Jun 2017
Australian Government Contribution:$150,000
Local Council/Shire:Shire of Shark Bay
State:WA

Project Description

This section of the Woodleigh-Byro Road is narrow and low from years of dry grading. The lack of correct camber and drainage allow the water from rain events to flow down the middle of the road creating dangerous ruts for the road users in this section.

Batters will be re-cut and widened to allow for a 9 metre running surface. Sub-base will be lifted and shaped with the correct camber with longatudinal and offshoot drain installlation to facilitate correct water flow in rain events. Material will be imported to sheet the sub-base to provide a suitable running surface. Installation of guide posts and signs to deliniate corners.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.