Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Ligar Street - 067012-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2017 - Aug 2017
Australian Government Contribution:$156,865
Local Council/Shire:Fairfield City Council
State:NSW

Project Description

The road section is affected by numerous crocodile shaped cracks, failures of road base course and deformation of roadsurface,which makes it very rough with poor ride quality

The proposed works include the replacement of failed areas of road pavement with asphalt and resurfacing of the whole area by hot mix asphalt . Length 492m, width=7.7m, Area =3760m2

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/11/2017