Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Fitzroy Street, St Kilda - 067037-16VIC-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Sep 2016 - Sep 2016
Australian Government Contribution:$314,570
Local Council/Shire:City of Port Phillip

Project Description

Deformed asphalt surface has been identified through road inspections. The pavement surface has changed from originally constructed profile, which may directly influence the riding quality, water ponding and skid resistance. Asphalt resheeting improves pavement performance with regard to the strength and riding quality.

40mm thick , size 10, type HP asphalt wearing course. The area covered is 5550 square metre (total length of 787 metre both directions and Average of 7.05 metre width). excluding separate bike lanes. Higher cost due to amount of traffic controllers and custormer service required.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/11/2016