Biddy Camm Road (Rural Road) - 067208-16WA-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Nov 2016 - Dec 2016
Australian Government Contribution:$97,132
Local Council/Shire:Shire of Lake Grace

Project Description

Insufficient floodway protection on popular road, thinning gravel and corrugation, intersection safety/improve vehicle mobility and sight lines at intersection.

Section 1 works include grading, compaction and application a 2-coat bitumen surface to the 100 metre floodway at Straight Line Kilometre (SLK) 3.270 to 3.370 and install a 12 metre wide 375mm culvert to the same floodway. Section 2 works includes gravel resheeting of road at SLK 76.750 to 80.330. End of section 2 at the Haig Road intersection at SLK 80.330, install a side road and T-Junction signs and replace old and faded chevron.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 17/05/2017