Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Biddy Camm Road (Rural Road) - 067240-16WA-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Apr 2017
Australian Government Contribution:$78,871
Local Council/Shire:Shire of Lake Grace

Project Description

Insufficient traffic protection for a floodway, insufficient and deteriorating drainage infrastructure that may lead to flooded moderate volume roads, chemical stabiliser testing.

Reseal a 200m-long bitumen floodway from SLK 58.910 to 59.110. Construct a new 200m-long floodway from SLK 61.520 to 61.720 and seal it with a 2-coat seal using 14mm then 10mm aggregate. Replace the 450mm headwalls located at SLK 59.512. Replace a degraded 450mm culvert at SLK 61.543 and install a new 450mm headwall at SLK 61.630. Carry out testing of a new chemical stabiliser from SLK 58.320 to 62.320 at a 10m road width (total of 36,000 m2).

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 17/05/2017