Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Sandy Point Road (Rural Road) - 067281-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Feb 2017 - Mar 2017
Australian Government Contribution:$500,000
Local Council/Shire:Goulburn Mulwaree Council
State:NSW

Project Description

The existing alignment of the road is not compliant with the Australian Standards and includes tight bends posing acute risk to vehicular traffic. Also the surface condition of pavement is in a poor state of repair which requires rehabilitation and reconstruction of the pavement.

Re-alignment of the 200 m long Road section including reconstruction of existing pavement replacing 200 mm of sub-base DGS 40 and 120 mm of base material DGB 20 with 14/7 two coat seal on top of a primer seal. The width of the treated road pavement is 9 m carriage way.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/02/2017