Mallee Tree Road (Rural Road) - 067419-16WA-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Apr 2017
Australian Government Contribution:$34,675
Local Council/Shire:Shire of Lake Grace

Project Description

Thinning gravel pavement, insufficient drainage and removal of redundant infrastructure.

Gravel sheeting along the section of road between SLK 6.500 and 8.000. Removal of a culvert at SLK 6.460 and replace it with a 150 metre floodway centred on the culvert that stretches from SLK 6.385 to SLK 6.535. New floodway will have a two-coat seal applied using 10mm and 14mm aggregate.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 17/05/2017