Biddy Camm Road (Rural Road) - 067428-16WA-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Jun 2017
Australian Government Contribution:$80,506
Local Council/Shire:Shire of Lake Grace
State:WA

Project Description

Thinning pavement, uneven road level, blowouts, broken culvert structure, encroaching grass and shrubbery, old and faded signage.

Raise the road surface over rocks between SLK 3.518 and 3.668. Resheet gravel between SLK 3.518 and 7.945. Culvert at SLK 7.185 is buried with broken 375mm concrete pipe and needs to be replaced with headwalls and installed at the correct depth. Old and faded "Give Way" sign at SLK 7.958 needs replacement. Reduce vegetation between SLK 3.518 and 7.945.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.