Duckworth Road (Rural Road) - 067573-16WA-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:May 2017 - Jul 2017
Australian Government Contribution:$99,968
Local Council/Shire:Shire of Lake Grace
State:WA

Project Description

Thinning pavement, broken pipes and headwalls, large tree in clear zone, encroaching grass/shrubbery.

On the section between SLK 0.000 and 3.000, widen formation and resheet gravel pavement, with vegetation reduction afterwards. Remove large tree at SLK 3.160. Multitudinal drainage works includes replacing 375mm pipe and headwalls at SLK 0.010; widen and replace headwalls on 450mm culvert at SLK 0.585; replace 375mm pipe and headwalls at SLK 2.900; install 375mm headwalls on pipe at SLK 7.030; install 300mm headwalls on pipe at SLK 7.540.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 17/05/2017