Wollongong Street, Shellharbour - 067930-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Dec 2017 - Sep 2018
Australian Government Contribution:$570,000
Local Council/Shire:Council of the City of Shellharbour
State:NSW

Project Description

This segment of roadway has been burdened by significant sub soil water problems over the years. The driving surface is cracked and fine roadbase material appears on the surface of the roadway even in dry weather. The road is a heavily trafficed section of the town and runs parallel to a popular beach area.

Engage geotechnical consultancy to review existing pavement and prepare design for renewal. Pavement Design: Zone 1 (roundabout to divided carriageway: 65m) - Mill 175mm down, replace with 125mm AC20 and 50mm AC14. Zone 2 (divided carriageway: 210m) - Mill 160mm down, stabilise pavement, place 110mm AC20 then 50mm AC14.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2018