Berthong Road Young (Rural Road) - 068163-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Sep 2017 - Jun 2018
Australian Government Contribution:$469,000
State:NSW

Project Description

The bitumen seal width at 5.5m is less than the adopted seal width for this hierarchy of road (7m adopted) and pavement depth is insufficient for heavy traffic loading.. This leads to pavement deformation and edge break causing poor ride quality and potential road safety issues; particularly on bends. Council incurs high recurrent maintenance costs in grading unsealed shoulders, repairing sealed edge break and patching the deformed pavement

Shoulder widening to bring the road up to the adopted route length of 4.7km repair and standard consisting of a 10mm formation and 8m seal width. Reconstruction of the existing pavement using in-Situ stabilisation to cater for current and future loading.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/05/2018