Moolau Avenue, Tweed Heads - 068171-16NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Feb 2017 - Jun 2017
Australian Government Contribution:$623,615
Local Council/Shire:Tweed Shire Council

Project Description

The existing road pavement is in poor condition with numerous surface defects, cracking and pavement failures. A lack of drainage around the road perimeter and cracked surfaces is allowing ingress of moisture and accelerated deterioration.

Rehabilitation through the excavation and removal of the existing pavement and the application of a new asphalt surface. Construct kerb and gutter to both sides of road and stormwater drainage pipe along Southern end.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/08/2017