Forest Rd, Hurstville - 068328-16NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Jan 2017 - Feb 2017
Australian Government Contribution:$275,455

Project Description

The asphalt road surface is subsided, cracked and had failed in many places with rutting and pot holes on the road surface indicating subbase failure.

To heavy patch areas between 50mm to 190mm in depth to repair the subgrade and subbase failure and resurface with 50mm thick heavy duty asphalt concrete layer. Approximate area to be rehabilitated is 2,600 square metres with dimensions, 290m long x 6.0m wide and 95m long x 9.0m wide sections.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 17/05/2017