Grove Avenue, Penshurst - 068333-16NSW-RTR

Funding Program:Roads to Recovery Program
Transport Mode:Road
Expected Start/Finish:Oct 2016 - Oct 2016
Australian Government Contribution:$229,460

Project Description

The asphalt road surface is subsided, cracked and had failed in many places with rutting and pot holes on the road surface indicating subbase failure.

To heavy patch areas between 50mm to 150mm in depth to repair the subgrade and subbase failure and resurface the road with a 40mm thick asphalt concrete layer. Approximate area to be rehabilitated is 3,920 square metres with dimensions, 436m long x 9m wide area.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/03/2017