Piambra Road (rural road) - 068720-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Oct 2016 - Jan 2017
Australian Government Contribution:$261,609
Local Council/Shire:Warrumbungle Shire Council
State:NSW

Project Description

The surface of Piambra Road in the proposed work location is unsealed and does not have sufficient road base, which results in potholes and ruts, which reduces the speed at which vehicles may travel along the road. Furthermore, the existing surface becomes slippery during and after rainfall

Constructing a road base over the existing alignment by adding up 300mm of compacted road base material, to a width of 8.0m. Bitumen sealing the surface to a width of 6.0m. Total length of works 1.4km.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.