Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Mt Nombi Road (rural road) - 091325-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Under construction
Transport Mode:Road
Expected Start/Finish:Sep 2017 - Apr 2018
Australian Government Contribution:$200,000
Local Council/Shire:Warrumbungle Shire Council

Project Description

The surface of Mt Nombi Road in the proposed work location is unsealed and does not have sufficient road base, which results in potholes and ruts, which reduces the speed at which vehicles may travel along the road. Furthermore the existing surface becomes slippery during and after rainfall.

Constructing a road base over the existing alignment by adding up to 300mm of compacted road base material, to a width of 8.0m. Bitumen sealing the surface to a width of 6.0m. Total length of works 1.5km.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.

Project details last updated: 10/11/2017