Waterside Parade, Peakhurst - 091358-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Apr 2017 - May 2017
Australian Government Contribution:$34,166
State:NSW

Project Description

The asphalt road surface is cracked and had failed in many places with rutting and pot holes on the road surface.

To heavy patch areas between 50mm to 100mm in depth to repair the subbase failure and overlay with 50mm thick asphalt concrete layer. Approximate area to be rehabilitated is 720 square metres with dimensions, 80m long x 9.2m wide.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/08/2017