Skinner Street, Ballina - 091375-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Nov 2016 - Mar 2017
Australian Government Contribution:$384,000
Local Council/Shire:Ballina Shire Council
State:NSW

Project Description

Old pavement and narrow seal has failed showing pavement rutting and shoving with significant heavy patching, which requires high maintenance resources. Also a section of drainage infrastructure being replaced.

Reconstruction of pavement and seal for a length of approximately 140 metres with a variable seal width (mostly 10.5 metres) including removal and replacement of unsuitable and contaminated subgrade, installation of approximately 140 metres of new kerb and gutter, replacement of approximately 100 metres of twin drainange lines and parking bays located at the eastern end.

Total cost of proposed project is $470,000

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 17/05/2017