Department of Infrastructure, Regional Development and Cities print logo Building our Future print logo

Elcombe Road (Rural Road) - 091498-16NSW-RTR

Funding Program:Roads to Recovery Program
Status:Completed
Transport Mode:Road
Expected Start/Finish:Jul 2017 - Sep 2017
Australian Government Contribution:$351,357
Local Council/Shire:Gwydir Shire Council
State:NSW

Project Description

Existing bitumen road surface has become fatigued due to traffic and the age of the pavement with the surface having numerous potholes and deformations and some areas of inadequate geometric alignment.

Strengthen the road pavement with a 150mm base overlay, widen the trafficable width and correct geometric alignment plus apply two coat bitumen seal and line marking. This will provide a stronger pavement, smooth surface and correct geometric alignment.

Disclaimer: The material contained in this site is made available on the understanding that the Department is not thereby engaged in rendering professional advice for a particular purpose. Before relying on the material in any important matter, users should carefully evaluate the accuracy, completeness and relevance of the information for their purposes and should obtain appropriate professional advice relevant to their particular circumstances.


Project details last updated: 10/04/2018