Funding Program: | Roads to Recovery Program |
Status: | Under construction |
Transport Mode: | Road |
Expected Start/Finish: | Aug 2017 - May 2018 |
Australian Government Contribution: | $1,112,167 |
Local Council/Shire: | Circular Head Council |
State: | TAS |
Project DescriptionRoad is significantly corrugated
Footpath and kerb infrastructure is at end of useful life
Road stormwater drainage is inadequate
It is proposed to resurface, re-profile and widen the existing road formation
Kerb and channel/ underground piped drainage system is proposed for installation where none currently exists
It is proposed that formalised car parking with a sealed surface be installed adjacent to the existing road formation
Total cost of proposed project is $1,900,000 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2018