Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Dec 2011 - Jul 2013 |
Australian Government Contribution: | $800,000 |
Local Council/Shire: | Shire of Ashburton |
State: | WA |
Project DescriptionBanjima Drive is an unsealed road which is deteriorating very quickly with corrugations, pot holes and loose gravel and continually requires to be graded and dampend down for safer driving conditions. The current condition of this road can be difficult at times, especially in the wet weather seasons when the dust component of the road either bogs into mounds that non-4 wheel drive vehicles would have difficulty in driving through or runs off leaving large open dangerous cracks.
Construct, stabilise and prepare for seal and complete required drainage, signage and guideposts.
Total cost of proposed project is $2,500,720 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2013