Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2013 - Mar 2014 |
Australian Government Contribution: | $212,347 |
Local Council/Shire: | Berrigan Shire Council |
State: | NSW |
Project DescriptionThis section of road is below adopted service width for the classification of this road. the narrow seal width is creating dangerous conditions for traffic that has to leave the sealed surface for passing traffic and with edge drop offs from the sealed surface
I is proposed to reconstruct the subject section of road to include: widening of the formation, stabilising of the subgrade and existing pavement material to a nominal depth of 200mm, and finally the application of a two coat bitumenous seal to a width of 6.0m on the straaigh and 6.5m on the curves.
Total cost of proposed project is $216,763 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014