Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2013 - Feb 2014 |
Australian Government Contribution: | $190,308 |
Local Council/Shire: | Loddon Shire Council |
State: | VIC |
Project DescriptionThe pavement in this section has deterioated significantly with a number of failures including pavement shoving, depressions and wheel tracking which hold significant amounts of surface water when it rains
It is proposed to mix and cement stabilise the existing pavement to a width of 6.2 meters then resheet with 100mm of Class 2 Fine Crushed Rock to a width of 9.2 meters which includes the road shoulder and then apply a 10mm primer seal over the 6.2 meter pavement |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2014