Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jun 2013 - Sep 2013 |
Australian Government Contribution: | $283,770 |
Local Council/Shire: | Central Darling Shire Council |
State: | NSW |
Project DescriptionExisting timber bridge is structurally unsound due to age and deterioration of timber elements. All critical structural components require replacement including piles, abutments and decking.
It is proposed to replace the existing timber bridge with a suitable concrete or steel bridge procured with a design and construct tender.
Single lane bridge length 20 meters width 5 meters |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/11/2013