Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Dec 2012 - Jun 2014 |
Australian Government Contribution: | $732,191 |
Local Council/Shire: | West Wimmera Shire Council |
State: | VIC |
Project DescriptionThe road surface is narrow, rough and uneven. This affects the trafficability and safety of the road which is a haulage route for grain trucks.
The section of road will be reconstructed for a total length of 2900m. The existing surface will be ripped and crushed and pavement material added to give an overall pavement width of 6.8m. The surface will be prepared and sealed with bitumen for a width of 6.2m. The job will be done over two years in two sections.
A final wearing sealed surface for the first section will be applied in December 2013 on the road for a length of 1500m and a width of 6.2m to protect the road formation from water, provide drainage and create a non skid surface |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014