Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jan 2014 - Mar 2014 |
Australian Government Contribution: | $194,287 |
Local Council/Shire: | Parramatta City Council |
State: | NSW |
Project DescriptionThe road is affected by delamination and disintegration of road surface and also with isolated failures. The road surface is very rough with unsatisfactory ride quality.
The proposed treatment include repair of failures, removal of the existing road surface and resurfacing of the road by placing new layer of asphalt. Length = 476 m; Width = 9.2 m; Area = 4379 m2. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2014