Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jun 2013 - Jun 2014 |
Australian Government Contribution: | $97,347 |
Local Council/Shire: | Parramatta City Council |
State: | NSW |
Project DescriptionThe road is affected by potholes, failed pavement areas and cracks. There are also numerous patches that makes the road surface rough to drive on.
The proposed treatment includes replacement of failed areas with asphalt and resurfacing of the road by placing new layer of asphalt. Length = 232 m; Width = 12 m; Area = 2784 m2.
Total cost of proposed project is $184,495 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014