Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2014 - Mar 2014 |
Australian Government Contribution: | $172,399 |
Local Council/Shire: | Melbourne City Council (City of Melbourne) |
State: | VIC |
Project DescriptionThe existing asphalt road surface is heavily rutted with substantial longitudinal and transverse cracking with fatigued appearance due to oxidation.
Proposed to cold plane profile the existing road surface to a depth of 50 millimetres for a length of 370 metres and a width of 13 metres and reinstate over the whole area with 10mm type H hot mix asphalt. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2014