Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2014 - Dec 2014 |
Australian Government Contribution: | $30,675 |
Local Council/Shire: | Shire of Northampton |
State: | WA |
Project DescriptionSeal is cracked and requires re-sealing, existing concrete kerb very old and extenisvely damaged, drainage is inadequate, angle parking areas are limited in number and congestion results, overall pavement surface very undulating
Remove all kerb, re-profile road surface by applying new asphalt surface, replace kerb, install side entry pit drainage points, increase width of street to provide an additional four parking bays
Total cost of proposed project is $67,344 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/02/2015