Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jul 2013 - Jun 2014 |
Australian Government Contribution: | $296,550 |
Local Council/Shire: | South Burnett Regional Council |
State: | QLD |
Project DescriptionWattlecamp Road is currently 3.6m wide road making it dangerous for overtaking or passing, that transitions to a two lane sealed pavement at each end. The road is a school bus route and has a high traffic volume. The cross drainage requires upgrading.
Shoulder widening - excavte and replace with suitable shoulder material. Provide an 8m formation with 300mm of pavement and 6.5m wide with a 2 coat seal. Upgrade the existing drainage crossing to 900mm diameter culverts. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/11/2014