Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Oct 2013 - Mar 2014 |
Australian Government Contribution: | $195,000 |
Local Council/Shire: | Shire of Moora |
State: | WA |
Project DescriptionRoad is subject to heavy vehicle traffic and requires upgrading to carry increased traffic loads.The road is also used by the local school bus and due to the road geometry concern is raised about the safety of children due to the traffic mix. Road is slippery during winter and dusty during summer thus causing traffic hazards.
Upgrade existing surface from gravel to a sealed 7.0 mtere wide pavement with 1.5 metre wide gravel shoulders |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014