Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2014 - Jun 2014 |
Australian Government Contribution: | $132,982 |
Local Council/Shire: | Weddin Shire Council |
State: | NSW |
Project DescriptionThis section of Pinnacle Road consists of only a 3.8m wide bituminous surface. Currently vehicles have to drop at least one wheel off the pavement onto the batter and table drain to pass in this narrow section. This puts strains on the edge of the pavement which requires constant repairs and reduces safety to traffic especially to the heavy vehicles including buses.
It is intended to widen the road formation to 8m with a 7m wide bitumen seal and a 0.5 metre unsealed shoulder on both sides. This project will include erecting & removing traffic control at the site, removing & reinstating signs & guideposts, clearing, excavation, adding gravel, widening the pavement, reconstructing the table drains, shaping, compacting, trimming and primer sealing incorporating 10mm aggregates with a 5mm scatter coat. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2014