Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Apr 2014 - May 2014 |
Australian Government Contribution: | $60,017 |
Local Council/Shire: | City of Subiaco |
State: | WA |
Project DescriptionLongitudinal/Reflective Cracking including depressions in the pavement. Localised pavement fatigue failure due to ageing of the Pavement.
Profiling the cracked pavement by 20-25mm thickness and resurfacing with Dense Graded Asphalt in the Traffic lanes and resurfacing with Red coloured Asphalt in the parking lanes.
Total length of Road-350 metres, Average width of pavement- 9.5 metres, Average area of pavement-3325 m2
Total cost of proposed project is $157,400 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014