Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Mar 2014 - Apr 2014 |
Australian Government Contribution: | $112,905 |
Local Council/Shire: | Shire of Murray |
State: | WA |
Project DescriptionThe wearing surface has deterioated badly, it is cracked and the edges are broken. The road is potholed and has various low spots where water ponds, therefore requiring minor reconstruction and possible regrading to improve drivability and drainage.
Reconstruct, regrade and asphalt overlay the full length. The works will involve reprofiling of pavement surface, widening the edges and installing kerbing and drainage structures as required.
Total cost of proposed project is $144,731 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014