Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2013 - Feb 2014 |
Australian Government Contribution: | $209,748 |
Local Council/Shire: | Shire of Murray |
State: | WA |
Project DescriptionThe current road seal is 3.7 metres in width with significant pavement and edge failures, an ongoing reconstruction program is being undertaken to improve the road standard and upgrade the access from the Coolup area toward the west to Old Bunbury Road which links in with the Forrest Highway.
Apply second coat seal to previously constructed sections for a length of 2.3 kilometres. Reconstruct, widen and install associated drainage for the last 500 metres to a minimum road width of 6.0 metres. These works will be ongoing until Fishermans Road is completed between the Coolup area and Old Bunbury Road. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014