Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Sep 2013 - Sep 2013 |
Australian Government Contribution: | $141,928 |
Local Council/Shire: | Parramatta City Council |
State: | NSW |
Project DescriptionThe road surface is affected by numerous potholes, cracks, pavement failures and repair patches. The surface is old and brittle. The surface drainage is poor due to the shape of the road.
The proposed works will include repair of pavement failures with asphalt and resurfscing of the road with asphalt. The shape of the road will be rectified so that the surface drainage is improved. Length = 412 m; Width = 11.6 m; Area = 4779 m2.
Total cost of proposed project is $150,770 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2014