Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Sep 2013 - Mar 2014 |
Australian Government Contribution: | $65,000 |
Local Council/Shire: | Indigo Shire Council |
State: | VIC |
Project DescriptionDuring storms stormwater runoff from road travels onto nature strip and into residents private property causes unsafe conditions during storms. Also gravel shoulder scours during storm events and deposits silt into sotrmwater drains causing blockages and increasing maintenance.
Construct concrete kerb for a length of 180 metres and connect to road drainage system and bitumen seal road shoulder. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014