Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Dec 2013 - Mar 2014 |
Australian Government Contribution: | $176,331 |
Local Council/Shire: | Loddon Shire Council |
State: | VIC |
Project DescriptionThis section of road has deteriated significantly with roughness, potholes and pavement failures.
It is proposed to mechanically mix and stabalise the existing 6.2 meter wide failed pavement, place and compact 150mm thick 6.2 meter wide chrushed rock pavement and then apply a 6.2 meter wide 10mm primer seal. There is also some drainage maintenance required. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/05/2014