Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Aug 2013 - Sep 2013 |
Australian Government Contribution: | $104,255 |
Local Council/Shire: | City of Armadale |
State: | WA |
Project DescriptionExisting asphalt surface urban road in Seville Grove is over 25 years old and is showing signs of cracking, flushing and pavement failure in one location. Kerbing is also in poor condition.
Proposal is to crack seal, re-surface with 30mm stone mastic asphalt, replace kerb along both sides, mill out and replace with thicklift asphalt for failed area at the end of road. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/11/2013