Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Jan 2014 - Mar 2014 |
Australian Government Contribution: | $56,273 |
Local Council/Shire: | City of Armadale |
State: | WA |
Project DescriptionExisting road is 7m wide with an asphalt wearing course. It is over 20 years old. The existing kerb is badly damaged along both sides and the asphalt surface is cracked over a considerable length.
Proposal is to crack seal, resurace with 30mm thick stone mastic asphalt to the full width of 7m. All of the existing kerb along both sides is also to be replaced. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014