Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Dec 2013 - Mar 2014 |
Australian Government Contribution: | $522,520 |
Local Council/Shire: | Loddon Shire Council |
State: | VIC |
Project DescriptionThis section of road has deteriated significantly with areas of severe roughness as well a large number of localised pavement failures and wheel rutting.
It is proposed to mechanically mix and stabalise the existing failed pavement to a width of 6.2 meters for 1.75km, place and compact a 150mm thick chrushed rock pavement at 6.2 meters wide and 1.75km long and then supply and place a 6.2 meter wide 1.75km long 10mm primer seal. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014