Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | May 2014 - Jun 2014 |
Australian Government Contribution: | $254,214 |
Local Council/Shire: | Wollondilly Shire Council |
State: | NSW |
Project DescriptionExisting road is rough with areas of the road base failing. It also has below grade kerb gutter and drainage (with grassed bank) within part of the road reserve for part of its length.
The works will include widening and strengthening the road for a length of 600 metres and a width of 11 metres and also drainage works to bring the kerb and gutter and stormwater pit up to the road grade.
Total cost of proposed project is $632,801 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/07/2014