Project DescriptionTrotter Road is a currently constructed from a limestone material which is difficult to maintain due to it becoming loose and dusty in summer and wet and severely potholed in winter.
Import and instal a new gravel pavement 6 metres in width and 200 millimetres in depth.
Total cost of proposed project is $53,805 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/04/2014