Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Nov 2013 - May 2014 |
Australian Government Contribution: | $160,693 |
Local Council/Shire: | Shire of Mt Marshall |
State: | WA |
Project DescriptionThe entire 3.50 kilometre length has an old 3.8 metre wide seal that is starting to crack and pothole requiring an increased amount of maintenance. Some parts of the road have been widened to 7.2 metres and these parts have not yet received their second seal and have been damaged by Heavy Access Vehicles that use this road.
The entire section is to be resealed with the smaller 3.8 metre wide sections remaining at 3.8 metres wide and the larger 7.2 metre wide sections remaining at 7.2 metres. |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014