Funding Program: | Roads to Recovery Program |
Status: | Completed |
Transport Mode: | Road |
Expected Start/Finish: | Sep 2013 - Jun 2014 |
Australian Government Contribution: | $108,000 |
Local Council/Shire: | Cocos (Keeling) Islands Shire Council |
State: | WA |
Project DescriptionCurrent road is an undulating grassed sand road with no design and prone to flooding during rain events. The road creates dust during the dryer months.
Design a brick paved road 136 metres long to tie in with existing Vacuum Sewer pits and allow for torrential rains to flow under or over the road to the drainage system. Construct kerbing each side and produce 22,440 bricks to pave the road.
Total cost of proposed project is $123,070 |
Disclaimer: The material contained in this site is made available
on the understanding that the Department is not thereby engaged in rendering professional
advice for a particular purpose. Before relying on the material in any important
matter, users should carefully evaluate the accuracy, completeness and relevance
of the information for their purposes and should obtain appropriate professional
advice relevant to their particular circumstances.
Project details last updated: 10/08/2014